![]() |
| Rain |
Humidity : 75 %
Wind Direction : North
Wind Speed : 12ckm/h
![]() |
| install last leaves door at wash room |
![]() |
| installing ceramic wall at wash room |
![]() |
| installing ceramic wall at wash room |
| kitchen room finish n clean |
| ceramic wall works at kitchen |
| leaves door installed at wash room |
| door frame & leaves finish at toilet |
| door frame & leaves finish at toilet |
| south walkaways |
| study room 1 finish & clean |
| study room 2 finish & clean |
| study room 3 finish & clean |
| library room 2 finish & clean |
| main stair ceramic works |
| stair & railling |
| hall building north view |
| hall building terrace view |




No comments:
Post a Comment