![]() |
| Thunderstorm |
Tempeature : 25 °C
Humidity : 82 %
Wind Speed : 8 km/h
![]() |
| separate the paint from the cans rust. old paint for painting the ceiling |
![]() |
| trrace border tile works |
![]() |
| leveling concrete floors in preparation for terrace floor border tile |
![]() |
| window hinge installing (north walkaways) |
![]() |
| re-sanding at double door wakaways |
![]() |
| railling works at north leader |
![]() |
| sanding toilet wall |
![]() |
| window hinge installing (north walkaways) |









No comments:
Post a Comment