Wind Speed : 24 km/h
| Stair wall finishing |
| main stair ceramic works |
| terrace railling out door finishing |
| rapairing gypsum compound at study room 2 |
| ceiling painting at study room 3 |
| toilet door frame coloring |
| cleanning toilet |
| floor ceramic wash room |
| kitchen ziink and tap installed |