Tuesday, January 31, 2012

Daily Report ; Tuesday, January 31, 2012

Weather Time Waingapu : 13:00:00 WITA
Overcast
Temperature      : 31 dC
Humidity            : 58%
Wind Direction  : North
Wind Speed       : 10 km/h





wild grass lanscape

stair ceramic

north view

last leaves window install

last leaves window install

Monday, January 30, 2012

Daily Report : Monday, January 30, 2012

Weather Time  Waingapu: 13:00:51 WITA
 
Overcast
Tempeature       : 31 °C
Humidity            : 62 %
Wind Direction  : North
Wind Speed​​       : 23km/h









apply silicon glue.(its me...)

wash room apply nat cement

installing kwh meter

apply nat cement at toilet

ceramic stair works

install glass

last leaves door for north door


Sunday, January 29, 2012

Daily Report : Sunday, January 29, 2012


Weather Time  Waingapu: 13:15:43 WITA


Overcast
Tempeature       : 30 °C
Humidity            : 77 %
Wind Direction  : North
Wind Speed​​       : 24 km/h










Stair wall finishing


main stair ceramic works


terrace railling out door finishing


rapairing gypsum compound at study room 2


ceiling painting  at study room 3


toilet door frame coloring


cleanning toilet


floor ceramic wash room


kitchen ziink and tap installed

Saturday, January 28, 2012

Daily Report: Saturday, January 28, 2012

Weather Time  Waingapu: 08:45:43 WITA


Overcast
Tempeature       : 31 °C
Humidity            : 76 %
Wind Direction  : North
Wind Speed​​       : 17 km/h








sanding kitchen opening

floor ceramic works at washing room

plashter works at wash room kitchen zink

window leaves at toilet

window leaves at toilet

window leaves at toilet

re-painting at study room 3

window leaves at toilet

window leaves at toilet

cutting stone fondation for ledder

cutting stone fondation for ledder


Friday, January 27, 2012

Daily Report : Friday, January 27, 2012

Weather Time  Waingapu: 08:45:09 WITA


Overcast
Tempeature       : 29 °C
Humidity            : 88 %
Wind Direction  : North
Wind Speed​​       : 21 km/h













our land is green now !
Photo Progress at 12:00 am WITA


Hall with terrace extention

build leaves door (not 23 but 24 peaces....)

wash room ceramic floor

nat cement works

nat cement works

nat cement works

facade with raillig  ledder

facade with railling  ledder

facade with lush weeds

skirting works

Thursday, January 26, 2012

Daily Report : Thusrsday, January 26, 2012

Weather Time  Waingapu: 13:20:33 WITA


Overcast
Tempeature       : 31 °C
Humidity            : 62 %
Wind Direction  : North
Wind Speed​​       : 27 km/h









Prainting skirting edge

installing main door

sanding door frame (existing)

ceramic tile wash room works