Temperature : 31 dC
Humidity : 58%
Wind Direction : North
Wind Speed : 10 km/h
| wild grass lanscape |
| stair ceramic |
| north view |
| last leaves window install |
| last leaves window install |
Right now is the biggest project the orphanage "Hammu Pangia" which Sumbanese for 'safe place'. Its main vision is to form an active household where children are not only educated, but also love, attention and training given.
| Stair wall finishing |
| main stair ceramic works |
| terrace railling out door finishing |
| rapairing gypsum compound at study room 2 |
| ceiling painting at study room 3 |
| toilet door frame coloring |
| cleanning toilet |
| floor ceramic wash room |
| kitchen ziink and tap installed |
| sanding kitchen opening |
| floor ceramic works at washing room |
| plashter works at wash room kitchen zink |
| window leaves at toilet |
| window leaves at toilet |
| window leaves at toilet |
| re-painting at study room 3 |
| window leaves at toilet |
| window leaves at toilet |
| cutting stone fondation for ledder |
| cutting stone fondation for ledder |
| our land is green now ! |
| Hall with terrace extention |
| build leaves door (not 23 but 24 peaces....) |
| wash room ceramic floor |
| nat cement works |
| nat cement works |
| nat cement works |
| facade with raillig ledder |
| facade with railling ledder |
| facade with lush weeds |
| skirting works |