Saturday, December 31, 2011

Daily Report : December 31, 2011

Saturday, December 31, 2011


Wheather Time : 2:00 pm
Rain


Temperature     : 27 °C
Humidity           : 67 %
Wind Direction  : North
Wind Speed​​      : 22 km/h
 _________________________________________________________________________________

Change the cable tension


Acrobatic Attractions (Change the cable tension)


final withdrawal of the cable at the transformer


final withdrawal of the cable at the transformer


Brick Railling at Leader


Border at Toilet


Ceiling Repair


Left facade


Right Facade
Make hole for ceiling repair

Re-Mounting Ceilling


Re-Finish Ceilling
List Plank Painting

Ceramic Floor works at toilet

Friday, December 30, 2011

Daily Report : December 30, 2011

Friday, December 30, 2011


Weather Time : 11:00 am WITA
Overcast


Tempeature       : 27 °C 
Humidity            : 76 %
Wind Direction   : Southwest 
Wind Speed​​       : 16 km/h



___________________________________________________________________________

Railling works at ladder

Border tile works at hall

Border tile works at toilet


Sand supply
___________________________________________________________________________-______
Weather Time : 01:00 pm WITA
Overcast


Tempeature       : 32 °C 
Humidity            : 62 %
Wind Direction   : Northeast 
Wind Speed​​       : 14 km/h



Thursday, December 29, 2011

Daily Report : December 29, 2011

Londalima/Kuta Sunrise
Thursday, December 29, 2011

Weather Time : 7:00 am WITA
Cloudy


Tempeature       : 26°C 
Humidity            : 89%
Wind Direction   : Southwest 
Wind Speed​​       : 6 km/h








Focus of today's work is border and skirting ceramic hall and toilets
Hall  :Border & Skirting use Benoa Gold Tile, 20x40 and 10x40 cm.
Toilet:Border use Benoa Gold 20x40


Cutting Border & Skirting
Cutting Ceramic Floor for Land Border
_______________________________________________

Weather Time : 9:00 am WITA

Cloudy


Tempeature       : 28°C 

Humidity            : 80%

Wind Direction   : Southwest 
Wind Speed​​       : 10 km/h






Wood Top Railling
Average measurement results:
length : 395 cm
width  : 11 cm
thick  : 5 -
7 cm

_________________________________________________________________



Weather Time : 02:00 pm WITA 

Rain...Partly Cloudy
Tempeature       : 29°C 
Humidity         : 63%
Wind Direction   : Southwest 
Wind Speed​​       : 10 km/h










wat ben je schieten?
after finish tile edges for mounting border
Smooth Pleste at South Male Toilet
Railling brick finishing
Cutting Border & Skirting

Wednesday, December 28, 2011

Daily Report: December 28, 2011

Wednesday, December 28, 2011

Weather       :Cloudy
Tempeature    :29°C - 32°C
Humidity      :71%
Wind Direction:North Wind Direction
Wind Speed​​    :23km/h


General Condition
312 meter square of Floor Ceramic Greacer Sand and Border/Skirting Ceramic already On Site.

Power Cable feed into KWH Meter Panel


Withdrawal of aerial cable


Floor & Border Ceramic


Adjustment leaves the window


Slab concrete top railling


Slab concrete top railling





Adjustment leaves the window


Power Transformator and LV Panel Board

Power Transformator and LV Panel Board

Our project under the twilight sky

Left side facade

Right side facade